Bid Day Checklist
The GC bid day playbook: from invitation to bid to submitted number
Home / Resources
Resources
Takeoff sheets, bid checklists, quote comparisons and calculators our team uses every day. Built for GCs, trade contractors, design firms and owner reps. Free to download, ready to use on your next bid.
Template Library
Pick your seat at the table, then narrow it down by trade. Every download comes with our compliments.
The GC bid day playbook: from invitation to bid to submitted number
Electrical takeoff template: devices, conduit, wire and gear in one workbook
How to estimate commercial HVAC: equipment, ductwork and labor
Comparing plumbing supplier quotes line by line: PVC, copper, PEX and cast iron
Bid leveling sheet: compare subcontractor bids apples to apples
Window and door takeoff from the schedule: a step-by-step workflow
Drywall and metal stud takeoff: wall types, linear feet to square feet, and waste
Pricing structural and misc. steel: mill, service center and fabricator markups
Scope gap checklist: the items that fall between trades
Ductwork takeoff by weight: gauges, fittings and the pounds-per-foot method
Plumbing takeoff: fixtures, rough-in and pipe by system
Multifamily lumber packages: how to price a turnkey framing package
How electrical contractors build a winning bid: exclusions, alternates and allowances
Concrete takeoff: footings, slabs, walls, rebar and the yardage math
Domestic vs. imported windows: comparing landed cost (FOB, freight and duty)
Material escalation clauses: protecting your bid when prices move
Rooftop units and split systems: comparing equipment quotes beyond the unit price
Estimating plumbing labor: units, crew productivity and adjustment factors
Steel takeoff from structural drawings: tonnage, connections and misc. metals
Conceptual estimating: from cost per square foot to a real budget
Estimating electrical labor units and adjusting them for your crews
Door, frame and hardware estimating: reading the hardware schedule
Roofing takeoff: squares, slopes, flashing and edge metal
Mechanical bid checklist: scope, controls, balancing and startup
Ready-mix and rebar pricing: what drives your cost per yard
Bid/no-bid scorecard for GCs and trade contractors
Plumbing bid exclusions and clarifications that protect your margin
Wood framing takeoff: studs, plates, sheathing and trusses by unit type
Estimating wall and ceiling labor: hang, tape and finish levels 1 to 5
Comparing switchgear and panelboard quotes: lead time, spec and substitutions
Earthwork takeoff: cut and fill, swell and shrink
How to request and compare supplier quotes: an RFQ that gets apples-to-apples pricing
Bidding Division 08: alternates, substitutions and submittal risk
Domestic steel sourcing: comparing service center quotes
Estimating sprinkler systems: heads, mains and hazard classification
Digital takeoff basics: scale, layers and a quality check before you price
Estimating concrete labor and forming: placing, finishing and form reuse
Wood vs. light-gauge steel framing: comparing cost for multifamily
Wall and ceiling bids: scope sheets, firestopping and who owns the gaps
Lighting fixture takeoff and package pricing
TPO vs. EPDM vs. PVC roofing: comparing system costs
Overhead, profit and markup: pricing a job so it actually makes money
Site utilities pricing: pipe, structures and trench costs
Estimating hydronic piping: pipe, fittings, valves and insulation
Flooring takeoff: square feet, waste, transitions and base
Plumbing fixture packages: comparing specified, or-equal and value-engineered options
Fire protection bids: design responsibility, hydraulic calcs and permits
Masonry estimating: CMU and brick counts, mortar, grout and reinforcing
Steel bids: connection design, erection and misc. metals scope
Estimating low voltage: data, security and access control
Sitework bid checklist: dewatering, haul-off and testing
LVT, carpet tile and polished concrete: comparing installed cost
Ceiling systems takeoff and pricing: grid, tile and specialty ceilings
Bidding multifamily framing packages: repetition, phasing and deliveries
Post-bid review: tracking win rate and why you lose
No templates match that search. Try a different trade or word, or ask us and we'll point you to the right one.
Monthly Price Watch
A plain, one-page look at material prices and lead times for your trade, straight from our supplier conversations. Unsubscribe anytime.
Send us your material list and we'll price it across our supplier network. We only quote what saves you at least 15%.
Talk to Our Team
Tell us what would make your bids easier. If it helps you, it probably helps others too, and we'll build it.
Someone from our team will reach out within one business day.